Installation
On-site installation, commissioning, and first-article validation.
Every EPS machine ships with on-site installation by an EPS field engineer. We power up the line, run validation parts, conduct Site Acceptance Testing and don't leave until the cell is producing to spec.

- On-site installation by EPS field engineers
- Mechanical, electrical, and pneumatic commissioning
- Network and PLC integration with your existing plant systems
- First-article print validation with your production parts and ink
- Initial operator training during install
- Documentation hand-off — recipes, maintenance schedule, spare parts list
What to expect

EPS installation typically takes 5 to 10 days depending on machine complexity and the level of integration with your existing line. We coordinate with your facilities team in advance to ensure power, air, network, and physical access are ready when our engineer arrives.